N&C Technology Limited
|
Place of Origin: | Guangdong, China (Mainland) |
Add to My Favorites | |
HiSupplier Escrow |
SMT 6p6c RJ45 RJ11 ethernet jack side enter jack tab down plastic
Description
Part Number: |
|
Specification: |
SMT 6p6c RJ45 RJ11 ethernet jack side enter jack tab down plastic |
Cross&Datasheet: |
|
Apllication: |
Connector |
Original Munafactuer: |
NICECONN |
Project Application: |
Step box,DVR,TV Box,IP CAMER |
SMT 6p6c RJ45 RJ11 ethernet jack side enter jack tab down plastic
Competitor Cross Reference
Part Number |
Manufacturer Part Number |
Manufacturer |
Description |
|
|
|
SMT 6p6c RJ45 RJ11 ethernet jack side enter jack tab down plastic |
|
|||
Series |
Connector Type |
Applications |
Mounting Type |
Connectors, Interconnects |
SMT Rj45 |
Connector |
SMT |
|
|||
Orientation |
Termination |
LED Color |
Shielding |
180 SMT Top enter |
Solder |
X/X |
No Shielded |
|
Why Choose NICECONNQuality
Quality :
World’s Leader supplier of Integrated RJ45 Connector and PCB connector
Except the plating ,From Design tooling, stamping ,Injection molding, assemble, Testing ,packing .All the step are doing by ourself. So we can control the quality.
Unit Price
Charge only 35~60% of Pulse ,Wurth(Midcom), Bothhand Belfuse, Tyco, Halo,....Etc
All the step are doing by ourself. So we can control the cost
NICECONN have more than 20 units automation equipments to product as possible
NICECONN consists of 3 subordinations , located partly in Hunan ,Hubei ,Guangdong
With large scale of production lines, we can reach to cost reduction at the most extent
Design&Technical strength
We have many more than 30years experience in connector industry engineer can support your new project.
Design a new tooling time:30-45 workdays
Production&Testing
NICECONN have more than 30 units automation equipments to product as possible
NICECONN Every Magnetic RJ45 tested 3times (not just batch tested)
NICECONN Every SMT part used Automation testing and packing.
Lead Time
With large Popularity of 450 Workers distributed in 4 subsidiary corporations, NICECONN can offer the fastest Lead time,and the particular case is according to the situation.
Case.1 |
Stock |
25% |
Case.2 |
3-4 Weeks |
70% |
Case.3 |
5-6 Weeks |
5% |
Service
PHC Offer good pre-sales & after-sales service &Strong technical support